Measuring Vertical Clearances

Discuss all Leica Cyclone, Cyclone REGISTER 360 & Cyclone FIELD 360 software here.
Post Reply
ginopalomo
I have made 10-20 posts
I have made 10-20 posts
Posts: 12
Joined: Mon Oct 08, 2012 11:16 am
11
Full Name: Eugenio Palomo
Company Details: Atkins North America
Company Position Title: Geomaticists II
Country: United States
Skype Name: eugenio.palomo
Linkedin Profile: Yes
Has thanked: 1 time

Measuring Vertical Clearances

Post by ginopalomo »

I love this tool. However, there's a 50/50 chance it will not run properly when trying to get multiple clearances at once. What am I doing wrong, any suggestions?
You do not have the required permissions to view the files attached to this post.
Yuelin
I have made 90-100 posts
I have made 90-100 posts
Posts: 99
Joined: Sat Mar 19, 2011 5:16 am
13
Full Name: Yuelin
Company Details: Leica Geosystems
Company Position Title: Lead software engineer
Country: USA
Linkedin Profile: No
Has thanked: 1 time
Been thanked: 11 times

Re: Measuring Vertical Clearances

Post by Yuelin »

From user's manual:
"This command requires selection of at least 2 points on the road surface to establish the travel lanes and 2 or 4 points on the lowest edges of the overhead structure (bridge, sign structure). The points must be selected in a specific order."

So you need to remove the last two pick points (11 and 12) to make it work.
Post Reply

Return to “Leica Cyclone, Cyclone REGISTER 360 & Cyclone FIELD 360”