Measuring Vertical Clearances
-
- I have made 10-20 posts
- Posts: 12
- Joined: Mon Oct 08, 2012 11:16 am
- 11
- Full Name: Eugenio Palomo
- Company Details: Atkins North America
- Company Position Title: Geomaticists II
- Country: United States
- Skype Name: eugenio.palomo
- Linkedin Profile: Yes
- Has thanked: 1 time
Measuring Vertical Clearances
I love this tool. However, there's a 50/50 chance it will not run properly when trying to get multiple clearances at once. What am I doing wrong, any suggestions?
You do not have the required permissions to view the files attached to this post.
-
- I have made 90-100 posts
- Posts: 99
- Joined: Sat Mar 19, 2011 5:16 am
- 13
- Full Name: Yuelin
- Company Details: Leica Geosystems
- Company Position Title: Lead software engineer
- Country: USA
- Linkedin Profile: No
- Has thanked: 1 time
- Been thanked: 11 times
Re: Measuring Vertical Clearances
From user's manual:
"This command requires selection of at least 2 points on the road surface to establish the travel lanes and 2 or 4 points on the lowest edges of the overhead structure (bridge, sign structure). The points must be selected in a specific order."
So you need to remove the last two pick points (11 and 12) to make it work.
"This command requires selection of at least 2 points on the road surface to establish the travel lanes and 2 or 4 points on the lowest edges of the overhead structure (bridge, sign structure). The points must be selected in a specific order."
So you need to remove the last two pick points (11 and 12) to make it work.